Core Drilling & Anchoring

Precise concrete openings and reliable anchor systems


At Binaa Al-Ghad, we provide professional core drilling and anchoring services that respect the structure, save time on site and give you clean, accurate openings ready for MEP works or structural connections. All works are executed under the supervision of qualified engineers and in line with the Egyptian Code and international standards.

What Is Core Drilling & Anchoring?

Core drilling is a controlled method of cutting circular openings through reinforced concrete, slabs, beams and walls using diamond-tipped drill bits.
Anchoring is the installation of chemical or mechanical anchors to fix steel plates, brackets, machines or strengthening systems safely into the concrete.

Together, core drilling & anchoring allow us to add new utilities, openings and structural elements without damaging the existing building.

whisk 2c77b3b116c7e5282904a5842651a1badr

Where Do We Use It?

 

  • Openings for HVAC ducts, water pipes, drainage and electrical conduits

  • Passing new services through slabs, beams and shear walls

  • Fixing façade brackets, canopies and handrails

  • Anchoring steel beams, plates and corbels for structural strengthening

  • Anchor bolts for machinery, pumps and heavy equipment

  • Installing dowels for slab extensions and new stair flights

whisk a048222027ca757a5614214fa4ade7e9dr
whisk 3ea09c996709278a71940451b358ac4cdr
whisk ca089e5e2cbde99a84545bd852fd1e8fdr

Our Core Drilling & Anchoring Process:

 

1. Site Survey & Assessment
We visit the site, review drawings and understand the purpose of every opening or anchor.

2. Scanning & Marking
Where required, we scan the concrete to avoid main reinforcement and hidden services, then mark exact drilling positions and anchor layouts.

3. Protection & Setup
We protect nearby finishes, install supports for the drilling rig and prepare water, power and slurry collection.

4. Core Drilling
Diamond core drilling with calibrated machines to achieve clean, accurate holes with minimal vibration and noise.

5. Anchor Installation
Installation of chemical or mechanical anchors as per designer specifications, including hole cleaning, resin injection or torqueing.

6. Testing & Clean Handover
Load tests where required, documentation of anchor types and locations, then thorough cleaning of the work area before handover.

 

Why Binaa Al-Ghad?

 

  • Engineering-based solutions – All works are executed according to design requirements and the Egyptian Code.

  • Accuracy & cleanliness – Clean edges, correct diameters and correct depths for every opening and anchor.

  • Minimal disruption – We plan work to reduce noise, vibration and interference with ongoing site activities.

  • Trained team – Skilled drill operators and technicians working under civil and structural engineers.

  • Safety first – Proper PPE, electrical and water safety, and controlled slurry collection and disposal.

whisk faff9dc5e8e1610bf064df3f235b46a3dr
whisk 24732869ed3989bb88d4b68f65e7ffa2dr
whisk ac533618c83613cbc6e4c200abe0bec4dr (1)

Technical Capabilities:

  • Core drilling diameters from [edit as needed – e.g. 30 mm to 600 mm]
  • Vertical, horizontal and overhead drilling

  • Wet drilling with controlled water and slurry management

  • Installation of both chemical anchors and mechanical expansion anchors

  • Anchors for tension, shear and combined loads as per design

  • Documentation of anchor type, diameter, depth and spacing